Waste landfill and sorting plant Ianca - Environmental infrastructure project
Name of the work: closing of non-compliant warehouse Ianca and construction of compliant warehouse and sorting station Ianca
Safe solutions for modernized waste management
BENEFICIARY: Braila County Council
ANTREPRENOR: Association INOVECO SRL (leader) - HIDROCONSTRUCTIA SA - ARGIF PROIECT SRL
DESIGNER: ROMAIR CONSULTING SRL
LOCATION: Locality Ianca, Braila County
The Ianca project contributes to reducing environmental risks, increasing recycling rates, soil and water protection, reducing uncontrolled landfilling, increasing health safety and sustainable development of the local community.
INOVECO SRL, the general contractor of the Ianca landfill and sorting plant project, has realized the closure of the non-compliant landfill and the construction of a modern compliant landfill, completed by a sorting plant with advanced technology. The project is part of the Integrated Waste Management System in Braila County and contributes to the reduction of pollution, controlled waste management and increased recycling in the area. Through high-performance technical solutions and environmental protection measures, INOVECO ensures a safe, sustainable system in compliance with European standards.
Works realized by INOVECO
- Definitive closure of the non-compliant warehouse and implementation of the monitoring system
- warehouse construction according to: cell 1, HDPE waterproofing, leachate collection, biogas collection
- realization of the sorting plant with complete technological line
- execution of technological, domestic and pluvial sewerage networks
- construction of the administrative area, the water tank, the washing station and access roads
- implementation of infrastructure for environmental protection: drains, ponds, pumping stations