CMID Vrancea - Construction of integrated center, sorting station and composting station Haret
Name of the work: integrated municipal waste management system in Vrancea county, construction of the integrated waste management center, sorting station and composting station Haret, Movilita commune, Vrancea county
Modern solutions for sustainable waste management in Vrancea
BENEFICIARY: Vrancea County Council
ANTREPRENOR: INOVECO SRL
LOCATION: Haret Locality, Movilita Commune, Vrancea County
The implementation of CMID Vrancea reduces soil and water pollution, increases recycling capacity, improves the quality of sanitation services and contributes to protecting the environment for the county's inhabitants in the long term.
INOVECO SRL participated in the realization of the CMID Vrancea project, part of the Integrated Waste Management System in Vrancea County, by building the Integrated Waste Management Center, sorting plant and composting plant in Haret, Movilita commune. The investment includes a modern ecological landfill (Cell 1), an extended platform for the processing of biodegradable waste, a fully equipped sorting station and a set of technical-administrative buildings that support the operational activity of the whole system.
The project focused on the realization of the waterproofing and drainage infrastructure for Cell 1, the implementation of leachate collection and evacuation systems, the arrangement of internal roads and technological platforms and the construction of all the necessary facilities for the efficient operation of CMID Vrancea. The aim of the investment is to increase the degree of waste recovery, reduce environmental impact and modernize waste management throughout the county.
Works realized by INOVECO
- Rehabilitation of water supply pipelines and modernization of the storage reservoir
- Extension of distribution networks and new connections to consumers
- Rehabilitation of the existing sewerage network and replacement of damaged sections
- Extending the sewerage network on new streets and increasing wastewater collection capacity
- Installation of pumping stations to ensure correct wastewater transportation