











Tecuci warehouse closure - Rehabilitation and ecological restoration project
Design, PAC + POE + PTE phase and technical assistance from the designer during the execution of works, and execution of works for the realization of the investment objective: "INCHIDERE DEPOZIT NECONFORM Rates - Tecuci" component of the project "INTEGRATED WASTE WASTE MANAGEMENT SYSTEM IN GALATI JUDETUL GALATI".
Complete greening and environmental protection within SMID Galati
BENEFICIARY: Galati County Council
ANTREPRENOR: INOVECO SRL
DESIGNER: ISPE PROIECTARE si CONSULTANTA S.A.
LOCATION: Tecuci Municipality, Galati County
The Tecuci landfill closure project contributes to reducing pollution, improving environmental quality, community safety and sustainable development of Galati County.
INOVECO SRL, the general contractor of the Tecuci landfill closure project, carried out the design and execution works for the final closure and ecologization of the non-compliant Rates - Tecuci landfill, part of the Integrated Waste Management System in Galati County. By implementing modern technologies of sealing, drainage and monitoring, the company ensured a complete rehabilitation of the site, according to European environmental standards.
The sustainable technical solutions applied by INOVECO contribute to the restoration of the local ecosystem, the elimination of soil, water and air contamination risks, as well as to the improvement of health safety for the local communities.
The Tecuci landfill closure project aims to reduce the impact on the population's health and ensure a sustainable transition to a responsible waste management system at county level.
Works realized by INOVECO
- relocation and redevelopment of non-conforming waste mass
- execution of the final sealing and waterproofing system
- implementation of landfill gas capture and neutralization systems
- stormwater collection and drainage and leachate management
- landscaping, monitoring and flood protection works
