Execution of works in Botosani
Name of the work: "Elaboration of the Technical Project and technical assistance from the designer during the execution of the works and acquisition of the execution of the works for the closure of the waste deposits for the investment objective "CLOSURE OF NON-CONFORMING SST IN BOTOSANI MUNICIPALITY, BOTOSANI COUNTY".
PROJECT DETAILS
The beneficiary of this project is the Botosani Administrative Territorial Unit, and the developer of the technical execution project, including the execution details is THP Engineering SRL.
The investment object is part of the "Environment, Climate Change Adaptation and Ecosystems" Programme (RO-MEDIU), which aims to improve people's health, reduce the risk of disease and restore the natural environment.
The technical characteristics of the Botosani temporary storage enclosure are defined and comply with the design regulation 757/2004.
In accordance with the provisions of H.G. 766/1997 the building is classified in category "C" of importance and in accordance with the "Seismic Design Code - Part I: Design Requirements for Buildings", P100/1-2013, the building is classified in class IV of importance.
LOCATION DETAILS
The site under study is located in the south-eastern part of Botosani Municipality in Botosani County, in the immediate vicinity of the closed municipal waste landfill.
The Botosani temporary household waste platform is located in Botosani County, south about 70m from the nearest public road and about 400m from the nearest village. The nearest watercourse (parau) is approx. 270 m. The deposit is partly covered with soil and plants, and its slopes are irregular and of average values.
The site under study is located in the south-eastern part of Botosani Municipality in Botosani County, in the immediate vicinity of the closed municipal waste landfill.
The Botosani temporary household waste platform is located in Botosani County, south about 70m from the nearest public road and about 400m from the nearest village. The nearest watercourse (parau) is approx. 270 m. The deposit is partly covered with soil and plants, and its slopes are irregular and of average values.
INVESTMENT OBJECTIVES WORKS IN BOTOSANI
The project envisages the final closure with a surface sealing system of the existing landfill, the installation of the landfill gas aeration and extraction system and the surface water and leachate collection and disposal systems.
WORKS EXECUTED IN BOTOSANI WITHIN THE PROJECT
- Preparation of PAC/DTAC, PTh, DE, specifications by specialties and project site organization
- Technical assistance during the execution of works
- Preliminary earthworks (removal of large and small vegetation from the site)
- Site organisation
- Earthworks (excavation, transport, levelling, smoothing of the ground surface)
- Levigated colander
- Execution of gas wells
- Construction of groundwater monitoring wells
- Execution of fencing
- Construction of perimeter road
- Final warehouse sealing system
- Landscaping: watering with watering
- Installation of CCTV installation and execution of photovoltaic system for power supply
Do you want to know more about our ongoing projects?
The teams of specialists within Inoveco are at your disposal for any kind of questions about the products and services in our portfolio.