fbpx

Closure of non-compliant waste dump in Ploiesti and construction of SMID waste transfer stations in Prahova County, within the integrated waste management system project in Prahova County

Within the project, the following were carried out:

Busteni shuttle station.

The location of the transfer station comprises 2.1 ha (21,195 sqm) and is located in the administrative limit of two towns Busteni and Sinaia, belonging to the public domain of the two cities.

Thus on the administrative limit of Busteni is the area of about 1 ha (9,993 sqm) and on the administrative limit of Sinaia is the area of 1.1 ha (11,202 sqm). The site is located at a distance of about 800 m from the habitable zone.

Urlati Transfer Station

The site comprises 2.0 ha, being located in the village of Urlati, Prahova County, at a distance of about 360 m from the inhabited area of Urlati and belongs to the public domain of Urlati.

Road access is via the County Road DJ 102C. closing the urban warehouse nonconfrom Ploiesti

The site occupies an area of 31.0 ha, according to topographical studies, being located in the intravilan of Ploiesti Municipality, Prahova County, at a distance of about 1,080 m from the inhabited area of Ploiesti Municipality and belongs to the public domain of Ploiesti Municipality. Road access is via the COUNTY Road DN1A.