Construction works related to the project "Closing non-compliant warehouse Ianca and constructive warehouse according to and sorting station Ianca" within the project "Integrated Waste Management System in Braila County"
Description of the works:
Contract – Construction works related to the project "Closing non-compliant warehouse Ianca and constructive warehouse according to ianca sorting station" within the project "Integrated Waste Management System in Braila County", included:
- Disposal of waste and implementation of a non-compliant warehouse closure system.
- Construction of a landfill in the village of Ianca, including supply, installation, commissioning and running for machinery and technological equipment;
- Construction of a Waste Sorting Station with a capacity of 5,000 tons/year in the village of Ianca.
- Design activities on the detailed technical project for the investment Ianca Sorting Station
INCLUDING THE NECONFORM IANCA DEPOSIT
The characteristic parameters of the warehouse:
- Area occupied by the warehouse after completion of the final closure works (inspection roads, monitoring boreholes, storm sewerage, decanter): 12,142m2;
- Volume of waste stored at the date of the final closure of the non-compliant warehouse 20,050 m3;
Detail of the goal achieved
Work to close the non-compliant warehouse
– the most Surface covered with closing layers :
- support layer 0.5 m thick: 3.367 m3
- water drainage layer, thickness 0.4 m: 875 m3
- geosynthetic gas collection: 6,960 m2
- geocomposite drainage: 8,430 m2
- geosynthetic separation and filtration: 10,070 m2
- uncompacted clay soil 1 m thick: 9,981 m2
Construction for environmental protection:
- Lower perimetral dalat: 364 m
- Dispersion basin 12×4 m : 1 pcs
Construction for post-closure monitoring
- Broken stone road: 95 m3
- Biogas capture (gas capture and passive degassing wells)- 4 pcs
- Monitoring drills : 2 pcs
CONSTRUCTIA DEPOSITED CONFORM IANCA
- The construction of the compliant waste dump, having a capacity of 248,526 m3 and an area of the actual landfill of 3,77 ha, includes:
– construction of the first cell of the 1.17 ha deposit,
– collection system, leachate transport including leached retention and pumping tank, leached pumping station and leachate treatment plant,
– biogas collection system,
– construction of buildings (administrative building, machinery intervention hall, etc.),
– specific infrastructure (car scale, car wash station, fuel station, etc.),
– environmental monitoring system,
– other works (roads, stormwater collection system, retention and evaporation basin V=4800 m3, hydrocarbon separator Qmax=150l/s, drinking water supply, sewage treatment plant household wastewater and sewage household wastewater, stormwater sewerage, technological water collection, enclosure fencing and access gate, entrance barrier, etc.).
CONSTRUCTIA OF THE DEPOSITION CONFORM CELULA 1 DESOR DEPOSITION
The main works consisted of:
· Mechanical discovery of vegetable soil on a depth of 30 cm, on the surface of 72,600 m2;
· Cell dig: 21,760 m3;
· Compacted fillers (digs): 20,925 m3;
The waterproofing system of the storage cell was made as follows:
· geological barrier constructed of clay with a thickness of 0,50 m – 6,257.50 m3 and bentonite geocomposite AS-5000.
· HDPE geomembrane: 13,846 m2;
· protection geotextile: 13,605 m2.
The leachate collection system shall comprise:
· Drenant layer for leaching: 8035 m3;
· geotextile separation and filtration resistant to UV: 13,192 m2
· leached pipes:
– drainage, PEHD, Sn 8 De 250 mm 143.80 m,
– collection, PEHD, Sn8 250 mm 263 m,
– collection, PEHD, Sn8 315 mm 128 m,
· PEHD connection scans, 4 pcs., diameter 1000 mm and height of 6,5-7,5 m;
· Retention basin V=15 m3 reinforced concrete waterproofed with HDPE geomembrane (2 mm);
· Leached pumping station consisting of home of PEHD Dn 1000 mm, H=6.8 m and submersible electropump with float;
· Leaching treatment plant with reverse osmosis, Q=2,8 m3/day;
· Camines concentrated collection.
Rainwater drainage system:
· the rainwater on the soles will be collected by the 880 m long dalat-bottomed ditch at the base of the outer slope of the contour dams of cell No.1 with discharge through a collector in the rainwater retention basin.
· The rainwater on the platforms and the road on the premises will be collected by the 553.70 m long monolith with discharge into a reinforced concrete settling house after which the waters pass through a hydrocarbon separator and discharged into the rainwater retention basin.
Sewerage network household wastewater
Household waste water from the administrative building and intervention hall is purified in a containerized treatment plant with a capacity of 3.14 m3/day.
Sewerage network technological waters
Waters from inside the sorting station and the two soproanes are taken over by the sewerage network and discharged into the leached pumping station.
ADMINISTRATIVE ZONE
Includes: access gate with electromechanical barrier, weighing platform, wheel cleaning equipment, mobile fuel station, administrative building, machine intervention hall.
Administrative building
The built area is 202m2 and comprises offices, laboratory for testing samples and keeping analyses performed for wastewater, toilets, showers, changing rooms, control room, archive, secretariat and central thermal room.
Road precinct, platforms, parking lots, gutters, pods
Roads allow access to the cell as well as traffic to the targets located within thestation.
The road in the enclosure in length of 895 m and width of 6 m is made with a superstructure in thickness of 20 cm of road concrete Bcr4 and an infrastructure of sand 7 cm, ballast 25 cm and ballast stabilized 15 cm, being bounded by the concrete border 20×25.
Warehouse monitoring
To monitor the warehouse, 3 wells were executed monitoring wells with H=7m of groundwater quality, located as follows: two downstream of the direction of water flow and one upstream. From these wells, water samples will be periodically taken for analysis.
STATEMENT OF SORTING (PROJECTION AND EXECUTION)
The sorting station is a metal construction, height regime: ground floor, with built area of 1582m2 which is composed of a closed hall and two soproane covered and partially closed on a height of 2 m. Minimum useful height of 6.50 m.
From a functional point of view,the following areas are identified in the sorting room:
- Sort area consisting of 1 full sort line, including press;
- Manoeuvring spaces for equipment and transport machines: forklift or front loader, container transport machine.
Constructive features of the Sorting Station:
- Total built area Sorting station = 1,582,00 m2.
- Treatment capacity: 000 tonnes/year,
- A sorting line with 8 sorting stations (4 sorting stations on each side of the strip),
Fire-fighting network
The fire-fighting network consists of:
- PEHD water transport pipe 110 mm, length 216 m;
- a number of 2 above-ground hydrants Dn 80 mm per network;
- a fire reserve storage tank with a capacity of 100 m3;
- concrete house Dn100 4 pcs;
- fire pumping group;
- metal container .
Road access to the site
The access road in length of 662 m, has km 0+000 to DJ 221 and ends at km 0+662 at the access gate in the sorting station. The intersection of the proposed access road with DJ 221 will be arranged by connecting with 12 m rays.
Drinking water bran
The water supply network is made of high density polyethylene pipe PEHD, De=110mm, PN10, being equipped with a valve home and apometer fireplaces.
The connection of the supply network of the sorting station will be ensured from the existing network – the high density polyethylene pipe PEHD, De=160mm , PN10, located next to the county road DJ221.
Electrical branatre to the zonal distribution network
The branist is composed of 3 poles fully equipped for connection to the existing network and crossing the county road, an underground power line of 20 KV in length of 720 m, and a trafo post .
Power supply network
The electrical distribution on the territory of the objective was made from TGD,to this connecting the distribution boards related to each area. The electric outdoor lighting installation is powered by the general TGD electric panel, by reinforced electric cable posed underground. The total length of the lighting network is 1,350 m. To provide the supply reserve of the pumping station related to the fire-fighting tank, a 35 kVA diesel triphase electrogen group was installed.
Constructions in which permanent activities are carried out are provided with safety lighting fixtures for evacuation, fire alarm and anti-fracking installation. The exterior lighting of the enclosure, consisting of 60 fully equipped poles. The electrical installation outside has provided a 40×4 mm 40×4 mm flat-length earthing belt. For the safety of electrical equipment, an internal plate 25×4 mm in length of 200 m has been installed.
In the area of the sorting station, a paratraznet system was installed attached to the outer earthing belt by means of separators.
In all spaces with permanent activity and in offices, laboratory, reception, a structured network of telephone and data was made.